Riverhouse Temporary Works

Advoled was tasked to provide a temporary works solution to support the overhead line while Riverhouse was being demolished for a new construction.

​

The design solution provided a temporary foundation of stacked concrete blocks to which an OLE pole was bolted. This design solution allowed the existing mast within the site compound to be removed and the cross span transferred onto the pole.